When I travel to many east coast cities, the ATL, Chicago and even Dallas, one of the things all those cities have in common is a rail component of their local public transit systems that connects to the airport.
Washington DC has alway had rail connected to Washington National Airport (I refuse to call it Reagan National), and you can catch a train from BWI to either DC or Baltimore. You also have the option of taking a WMATA bus to DC to the terminus of the Green Line.
The state of Virginia right now is busy expanding the Silver Line subway from its current western terminus at the Wiehle-Reston East station to Dulles airport and beyond it.
When I was in Denver for #CC15, while the construction for the RTA A Line rail system expansion to DIA was completed, it hadn't been opened yet because it was still undergoing the mandatory testing necessary before it could open for passenger service.
Los Angeles has been exponentially expanding their rail system as part of their preparations for the 2028 Olympic Games with a combination of subway and light rail projects scheduled to be completed as early as 2024. One of those rail projects is to connect to the under construction Crenshaw/LAX Line to LAX scheduled to open next year and the already in operation Green Line via an automated people mover.
I happily discovered when I attended #NN16 in St Louis that it has rail service from the airport to downtown. That line crosses the Mississippi River to East St Louis, IL
While as a proud Houstonian I hate to admit that Dallas is better than Houston in anything, one area I must give Dallas props for is their over 100 miles of DART light rail that covers much of the city.
The DART Orange Line terminates at DFW's Terminal A, and is part of the largest light rail system in Texas. The DART system also includes commuter rail lines to Denton and Ft Worth
DART is now currently planning a subway through downtown Dallas to eliminate the system bottleneck that has all four lines converging and traveling through downtown on dual tracks along Pacific Avenue. It's also planning the suburban Cotton Belt line which would connect Richardson, north Dallas and Addison to DFW Airport and the other existing light rail lines. There's also the TexRail project under construction that will connect Fort Worth to DFW's Terminal B, the existing TRE commuter line and the DART Cotton Belt Line.
But back to focusing on my end of I-45. So why doesn't my hometown have rail to Hobby and Intercontinental airports despite METRO being founded in 1978 with the goal of city wide rail service in mind?
It's a combination of factors. Rep John Culberson (R) and before him former Rep. Tom DeLay (R), along with the Harris County Republican Party, were militant rail opponents. The bad case of NIMBY syndrome that the Afton Oaks neighborhood along Richmond Avenue has just east of the Galleria /Uptown Houston area has had the effect of messing with multiple METRO attempts to logically route rail along Richmond Avenue to the Galleria through that area.
You also have all the naysaying anti-rail peeps who think building or widening freeways is cheaper than rail, nobody will ride it, and building roads is the only option capable of solving our Houston area regional transit issues.
But back to Culberson. At the behest of his Afton Oaks constituents and his party, he has repeatedly messed with METRO's plan to build the needed and necessary east west University (Blue) Line to connect the rest of the current system centered on downtown, the Texas Medical Center and the north east southeast sides of the city to the Galleria area and the Gold Line by messing with the federal funding.
Federal funding that the DFW area said 'thank you very much Houston' for allowing us to get it to build our rail system.
The Galleria area Gold Line that was approved by the 2003 rail referendum passed in large part by Black and Latinx voters is now being built as our first bus rapid transit (BRT) lane that can be easily converted to light rail in the future.
The BRT lane currently being built along South Post Oak Blvd and the West Loop to its northern terminus at the Northwest Transit Center could be eventually extended to the future Houston terminus of the Texas Central Railway bullet train between Dallas and Houston scheduled to start construction next year.
Their collective opposition to rail is so entrenched that Culberson is even bragging about in his campaign materials. That Republican opposition to METRO getting its fair share of federal money to build rail here is a major reason why the Dallas Fort Worth area has quickly amassed over 100 miles of it and is building more while we spin our wheels dealing with nuisance litigation from anti-rail opponents.
And yes, when the Katy Freeway was widened to a mind numbing 23 lanes at a cost of $2.8 billion, the MKT railroad corridor that ran parallel to it all the way to the western suburb of Katy was paved over.
That corridor could have been used for commuter or light rail. Same with the corridor along Westpark Road in which freight rail tracks were ripped up for a toll road.
And as you probably guessed, travel times on the Katy Freeway have gotten worse, not better since it was expanded. Since METRO paid for some of that project, one silver lining of it is the overpasses were built to handle the weight of rail cars if we finally go in that direction we should have and stick rail tracks in the middle of the freeway.
One of the major reasons that Houston was eliminated from the competition to get Amazon's second headquarters was lack of public rail transit to both major airports. Chicago, which we will pass soon to become the third largest city in the US, has had rail connections to both major airports for decades.
Looks like METRO is finally getting ready to address that issue, and it's about time.
METRO is seeking to at least get Hobby connected to the METROrail system. The current terminus of the Purple Line at the Palm Center Transit Center station is only three miles from Hobby airport. The Green Line's eastern terminus at the Magnolia Park Transit Center station in the East End is roughly the same distance from Hobby.
The distance from IAH to the current northern terminus of the Red Line at the Northline/HCC station is 11.5 miles, about the length of track that was built to expand the Red Line from the UH Downtown station to that point.
How they route the Purple and Green Lines to get to Hobby and the Red Line to IAH from their current termination points, and how much is it going to cost is the question right now.
While I'd like both projects to happen ASAFP, how fast that does occur depends on the upcoming 2018 midterm election in which Lizzie Fletcher is taking on Culberson.
In the wake of the failure to get Amazon's second HQ to locate here, and if Houston ever wants to see its Olympic hosting dreams come true, the incentive is there for Houston to handle its rail public transportation business.
And it needs to happen as quickly as possible.
Showing posts with label METRORail. Show all posts
Showing posts with label METRORail. Show all posts
Monday, October 01, 2018
Saturday, May 23, 2015
METRORail Green and Purple Lines FINALLY Open Today
You long time readers know that I am a rail enthusiast, and one of the things I was happy to see was METRO build a rail component to our transit system that started construction with a 7.5 mile (12.1 km) segment that opened for service in January 2004.
The METRORail Red Line has been wildly successful, with ridership projections four years ahead of schedule. After a successful 2003 referendum to expand the system to four lines, construction on the 5.3 mile (8.5 km) Red Line North Extension, the 3.3 mile (5.3 km) Green and (6.6 mile (10.6 km) Purple Lines began in 2009 with an original target date of 2012 completion for the Red Line extension and 2014 for the Green and Purple Lines.
But while the North Extension opened early in December 2013, construction delays, rolling stock procurement issues, and other problems caused by non-METRO construction projects pushed the opening of the Green and Purple Lines back to 2014, and eventually to today's opening date.
The Harrisburg bridge that will carry the Green Line over freight rail tracks and to the Magnolia Transit Center just broke ground in March and won't be completed until 2016.
The Gold Line through the Galleria area is being built initially as a bus rapid transit lane which will be able to be easily converted to light rail service in the future. That will allow it to be operational in 2017, while the needed east west University Line is on hold pending funding.
But the long awaited day is here, and METRO is celebrating with a free Railfest concert at BBVA Compass Stadium featuring Ne-Yo Frankie J and a fireworks finale. BBVA Compass Stadium sits at the junction between the Green and Purple Lines.
And just as was done when the North extention opened, rides on the rail system will be free all day.
The opening of the Green and Purple lines means that as of today, METRORail is not just one rail line, but a system spanning much of my hometown, with hopefully future expansion to Hobby and Intercontinental airports and the addition of a commuter rail component.
But until then, I'll take advantage of my free rides that start up in a few hours..
The METRORail Red Line has been wildly successful, with ridership projections four years ahead of schedule. After a successful 2003 referendum to expand the system to four lines, construction on the 5.3 mile (8.5 km) Red Line North Extension, the 3.3 mile (5.3 km) Green and (6.6 mile (10.6 km) Purple Lines began in 2009 with an original target date of 2012 completion for the Red Line extension and 2014 for the Green and Purple Lines.
But while the North Extension opened early in December 2013, construction delays, rolling stock procurement issues, and other problems caused by non-METRO construction projects pushed the opening of the Green and Purple Lines back to 2014, and eventually to today's opening date.
The Gold Line through the Galleria area is being built initially as a bus rapid transit lane which will be able to be easily converted to light rail service in the future. That will allow it to be operational in 2017, while the needed east west University Line is on hold pending funding.
But the long awaited day is here, and METRO is celebrating with a free Railfest concert at BBVA Compass Stadium featuring Ne-Yo Frankie J and a fireworks finale. BBVA Compass Stadium sits at the junction between the Green and Purple Lines.
And just as was done when the North extention opened, rides on the rail system will be free all day.
But until then, I'll take advantage of my free rides that start up in a few hours..
Saturday, December 27, 2014
METRORail Green and Purple Lines Opening Delayed Until 2015
The opening of the lines had already been delayed earlier this year to October. Because of problems with the Siemens axle counters that help METRO keep track of the rail cars and construction damage to a chilled water pipe under the Purple Line downtown, it pushed the opening of the new lines back to April 2015.
The opening of those lines when it finally happens will add another 10 miles of track to the already operational METRORail Red Line.
Far from 'nobody riding it' as rail critics deriding it as 'the toy train' loudly sneer, the METRORail is four years ahead of ridership projections with over 100 million boardings on just one 12.8 mile rail line. It is the second heaviest traveled rail system in the southern US.
One of the things delaying the opening is the new 1000 room Marriott Marquis Convention Hotel being constructed near the shared tracks of the Green and Purple Lines by Minute Maid Park. A chilled water pipe under that line was accidentally damaged by construction workers.
The repairs to it required tearing up the roadway, the section of light rail track above the damaged chilled water line it along with the fiber optics and communications, and then rebuilding and testing it to ensure it works properly. That process took twelve weeks, making it next to impossible for METRO to open the lines this year.
Out of the 39 cars contracted for by METRO, 12 have been delivered. Car 301, the lead one in the CAF ordered rail vehicles has successfully completed its 'burn-through' testing..
Construction has also been completed on the Central Transit Station which although it isn't as show stopping as the one the design contest winners came up with, will be ready when the Green and Purple lines finally open for service.
Labels:
Houston,
light rail,
mass transit,
METRO,
METRORail,
public transportation
Wednesday, August 13, 2014
Aww, METRORail Purple Line Opening Delayed Until December
I live about five blocks from where the METRORail Purple Line will terminate, and I have had a ringside seat for its construction, soon to be completion and anxiously anticipated by moi opening.
That was supposed to happen in October for the new Purple and Green Lines, but according to Swamplot, that's not going to happen until December for several reason not including the delay in getting the needed 39 railcars from CAF USA to start the new service.
Houston Rapid Transit, the contractor building the two new rail lines, won't be ready to turn the rail lines over to METRO until September 30. It will then take METRO sixty days to prepare the rail lines for revenue service.
In addition, the live wire testing is happening on both lines along with the initial construction of the second downtown 1000 room convention center area hotel scheduled to open in 2016.

The Altic and Cesar Chavez stations on the far end of the Green Line won't be accessible until the rail only overpass crossing the Union Pacific freight railroad tracks is completed.
It was going to be a rial and traffic underpass, but chemical contamination combined with liability concerns caused METRO despite the desires of the community to go with the overpass option.
Well, we've waited this long for the new Purple and Green Lines, what's another few weeks?
Now if we can get the federal funding we need to get the east-west Blue Line started to connect the rest of our rail system with the planned Bus Rapid Transit Gold Line in the Galleria area.
Houston Rapid Transit, the contractor building the two new rail lines, won't be ready to turn the rail lines over to METRO until September 30. It will then take METRO sixty days to prepare the rail lines for revenue service.
In addition, the live wire testing is happening on both lines along with the initial construction of the second downtown 1000 room convention center area hotel scheduled to open in 2016.
The Altic and Cesar Chavez stations on the far end of the Green Line won't be accessible until the rail only overpass crossing the Union Pacific freight railroad tracks is completed.
It was going to be a rial and traffic underpass, but chemical contamination combined with liability concerns caused METRO despite the desires of the community to go with the overpass option.
Well, we've waited this long for the new Purple and Green Lines, what's another few weeks?
Now if we can get the federal funding we need to get the east-west Blue Line started to connect the rest of our rail system with the planned Bus Rapid Transit Gold Line in the Galleria area.
Labels:
Houston,
light rail,
METRO,
METRORail,
Texas
Saturday, April 12, 2014
Construction Starting On METRORail Central Station
Central Station's design was supposed to be selected from a competition in which five finalists presented futuristic designs that they hoped would become the signature station of the METRORail system.
But delays, cost overruns, the winner not being selected until September 2013 and fears that Central Station wouldn't be completed in time for the third quarter 2014 opening of the Green and Purple Lines to revenue service led METRO to scrap it last November and replace it with the generic stations platform
The Red Line is shut down this weekend from the Downtown Transit Center to the Northline TC to begin construction of the Central Station platforms.
But it would have been nice to see the signature Snohetta design going up.
Thursday, February 27, 2014
White Suburban Houstonians-If You Want Rail...
Tell your GOP legislators representing you to stop messing with METRO's ability to get federal dollars so we can build it faster.
As y'all know I am an enthusiastic proponent of public transit, especially when it comes to adding rail to the mix.
One of the reasons our local transit agency METRO was founded in 1978 was to take over the HouTran bus system which was plagued with frequent service problems and an elderly bus fleet ina rapidly growing city. Part of the sizzle that sold the initial creation of METRO and the 1 cent tax many of us in the area pay to fund it was the promise of a heavy rail subway system that was supposed to have become operational in the 1990's.
But fighting the creation of that METRO rail component has been a staple of local conservafool politics since the 1980's. A coalition comprised of the Harris County Republican Party, right wing Houston Republican councilmembers like Rob Todd in concert with Rep Tom DeLay and Rep. John Culberson along with the useful fools with NIMBY syndrome have fought every METRO plan to that sough to add a rail component to our large bus oriented system citing cots or other specious reasons as our city continued to grow along with the traffic problems on our expansive freeway system.
DeLay as part of those efforts to block rail got $65 million in federal funding stripped from the project. But other leaders and visionaries who had Houston's long term future in mind also noted that a city as expansive as ours could no longer have a transit system exclusively reliant on buses, needed a rail component and fought just as fiercely to make it happen.
They got around the federal funding roadblock that DeLay placed in its way by coming up with a locally funded plan to build a 7.5 mile long light rail line from Reliant Stadium to downtown Houston terminating at UH Downtown.
That plan was fought in the courts with rail proponents prevailing, and on March 13, 2001 ground was broken on the METRORail Red Line that opened to service January 1, 2004.
A subsequent narrowly approved 2003 referendum authorized the expansion of METRORail with non-white communities providing the critical votes to get that victory. Construction subsequently started on the North Line (Red Line extension), East End (Green) and Southeast (Purple) lines while planning on the University (Blue) and Uptown (Gold) continues.
While the sorely needed east-west oriented Blue Line has gotten the final FTA approval it needs before construction can begin, it's the lack of federal money that's the problem.
The start of construction on the Blue and Gold Lines has been on hold pending additional federal funding, but a BRT (bus rapid transit) proposal to get the Gold Line through the Galleria corridor started has been gaining ground. One of the appealing parts of the plan is that it could be completed as early as 2017 with the ability to convert it to light rail later if needed.
Where the grousing has been coming from is the outside I-610 Loopers whining about the fact the initial rail lines have not only been built inside the Loop, but have been extended to predominately Black and Latino neighborhoods.
Well, let's be real about that. Black and Latino voters were the major reasons the 2003 rail expansion referendum passed, and it's logical and only fair that the first expanded lines went to serve those neighborhoods who actually use public transportation.
Since the goal is to eventually connect the light rail system to Hobby and Intercontinental airports via the Red and Purple lines, the ideal routes to get there pass through those same predominately Black and Latino neighborhoods chock full of people who have no qualms taking public transpeople and who will use the light-rail system once it is built because it's faster than taking the bus.
The Purple Line passes by the University of Houston on its way to its current southern terminus at the Palm Center Transit Center which is 5.5 miles from Hobby. (and a few tantalizing blocks from where I currently live) The Green Line on its 3.3. mile journey passes BBVA Compass Stadium. Once the lines merge at the stadium they share track together into downtown past the George R. Brown Convention Center, Discovery Green, Minute Maid Park and terminate just past the Wortham and Hobby Centers.
The Outside the Loopers not only want light rail routes to their areas, but also want commuter rail. I agree with them.
I'd like that too as an Inside the Looper I'd love to have another way to get to Galveston besides driving down I-45 south or a Greyhound bus ride. A commuter rail route would be just the ticket to do so, especially if it made a stop in the Clear Lake area so you could access NASA, Space Center Houston and the Kemah Boardwalk. Since Galveston now has cruise ships departing from it, would be nice to have a way to get down there for those cruises and leave your car parked in your driveway
Frankly we could also use commuter rail from Katy eastbound to connect with the future Gold Line and in that 290 Cypress-Jersey Village corridor to that point as well. A commuter rail line would also be helpful coming from the Woodlands and Kingwood south, from Baytown going west and the Pearland-Manvel area going north. There is a commuter rail line being discussed and studied that would run from Missouri City-Sugar Land to connect with the METRORail Red Line Fannin South terminus.
But here the rub to making that all happen. Money is the first issue. The other is many of those areas I mentioned are represented by Republicans, a party that as I have noted is anti-public transportation, anti-progress and anti-rail.
The bottom line is that we cannot keep building freeways in the Houston metro area forever. We are now working on a third freeway loop around the city of Houston primarily connecting the exurbs called the Grand Parkway, and building freeways is more expense than the initial costs for installing a rail system the anti-rail folks like to harp on..
White suburban Houstonians, the onus is on you if you want much needed rail in your Outside the Loop and exurban locales. You have to help us Inside the Loopers fight for it, too. You need to tell your GOP legislators to back up off of METRO and let the federal money flow toward building an extensive rail network across this area. And if they aren't willing to do that, then you replace them with legislators who will fight for rail in this area as part of a smart and comprehensive transit plan for our Houston metro area..
As y'all know I am an enthusiastic proponent of public transit, especially when it comes to adding rail to the mix.
One of the reasons our local transit agency METRO was founded in 1978 was to take over the HouTran bus system which was plagued with frequent service problems and an elderly bus fleet ina rapidly growing city. Part of the sizzle that sold the initial creation of METRO and the 1 cent tax many of us in the area pay to fund it was the promise of a heavy rail subway system that was supposed to have become operational in the 1990's.
But fighting the creation of that METRO rail component has been a staple of local conservafool politics since the 1980's. A coalition comprised of the Harris County Republican Party, right wing Houston Republican councilmembers like Rob Todd in concert with Rep Tom DeLay and Rep. John Culberson along with the useful fools with NIMBY syndrome have fought every METRO plan to that sough to add a rail component to our large bus oriented system citing cots or other specious reasons as our city continued to grow along with the traffic problems on our expansive freeway system.
They got around the federal funding roadblock that DeLay placed in its way by coming up with a locally funded plan to build a 7.5 mile long light rail line from Reliant Stadium to downtown Houston terminating at UH Downtown.
That plan was fought in the courts with rail proponents prevailing, and on March 13, 2001 ground was broken on the METRORail Red Line that opened to service January 1, 2004.
While the sorely needed east-west oriented Blue Line has gotten the final FTA approval it needs before construction can begin, it's the lack of federal money that's the problem.
The start of construction on the Blue and Gold Lines has been on hold pending additional federal funding, but a BRT (bus rapid transit) proposal to get the Gold Line through the Galleria corridor started has been gaining ground. One of the appealing parts of the plan is that it could be completed as early as 2017 with the ability to convert it to light rail later if needed.
Where the grousing has been coming from is the outside I-610 Loopers whining about the fact the initial rail lines have not only been built inside the Loop, but have been extended to predominately Black and Latino neighborhoods. Well, let's be real about that. Black and Latino voters were the major reasons the 2003 rail expansion referendum passed, and it's logical and only fair that the first expanded lines went to serve those neighborhoods who actually use public transportation.
Since the goal is to eventually connect the light rail system to Hobby and Intercontinental airports via the Red and Purple lines, the ideal routes to get there pass through those same predominately Black and Latino neighborhoods chock full of people who have no qualms taking public transpeople and who will use the light-rail system once it is built because it's faster than taking the bus.
The Purple Line passes by the University of Houston on its way to its current southern terminus at the Palm Center Transit Center which is 5.5 miles from Hobby. (and a few tantalizing blocks from where I currently live) The Green Line on its 3.3. mile journey passes BBVA Compass Stadium. Once the lines merge at the stadium they share track together into downtown past the George R. Brown Convention Center, Discovery Green, Minute Maid Park and terminate just past the Wortham and Hobby Centers.
The Outside the Loopers not only want light rail routes to their areas, but also want commuter rail. I agree with them.
I'd like that too as an Inside the Looper I'd love to have another way to get to Galveston besides driving down I-45 south or a Greyhound bus ride. A commuter rail route would be just the ticket to do so, especially if it made a stop in the Clear Lake area so you could access NASA, Space Center Houston and the Kemah Boardwalk. Since Galveston now has cruise ships departing from it, would be nice to have a way to get down there for those cruises and leave your car parked in your driveway
Frankly we could also use commuter rail from Katy eastbound to connect with the future Gold Line and in that 290 Cypress-Jersey Village corridor to that point as well. A commuter rail line would also be helpful coming from the Woodlands and Kingwood south, from Baytown going west and the Pearland-Manvel area going north. There is a commuter rail line being discussed and studied that would run from Missouri City-Sugar Land to connect with the METRORail Red Line Fannin South terminus.
The bottom line is that we cannot keep building freeways in the Houston metro area forever. We are now working on a third freeway loop around the city of Houston primarily connecting the exurbs called the Grand Parkway, and building freeways is more expense than the initial costs for installing a rail system the anti-rail folks like to harp on..
White suburban Houstonians, the onus is on you if you want much needed rail in your Outside the Loop and exurban locales. You have to help us Inside the Loopers fight for it, too. You need to tell your GOP legislators to back up off of METRO and let the federal money flow toward building an extensive rail network across this area. And if they aren't willing to do that, then you replace them with legislators who will fight for rail in this area as part of a smart and comprehensive transit plan for our Houston metro area..
Labels:
Houston,
light rail,
mass transit,
METRO,
METRORail,
politics,
public transportation,
Texas
Saturday, December 28, 2013
METRORail Test Train Phase Beginning On East End Line
As was done on the North Line earlier this year, the initial phase will be with an unpowered rail car being pushed or towed along the tracks at no faster than five miles per hour and escorted by METRO police.
Just as was the case when the unpowered train testing was done on the North Line, the tests are to ensure there are no bends or bumps in the Green Line tracks. The workers will be checking train clearance, ensuring signals are working properly and if that isn't the case, the train is stopped and the location of the problem logged so that it can expeditiously be corrected.
At the moment the Green Line opens for revenue service, METRORail will truly become a light rail system and not just one 12.8 mile long line from the south side Fannin South Station to the Northline TC/HCC one via the Med Center and downtown.
And yeah, it goes without saying, I can't wait for the Purple Line near me to open as well.
TransGriot Update: The start of the testing phase on the East End/Green Line got delayed until January 24
Labels:
Houston,
light rail,
mass transit,
METRO,
METRORail,
Texas
Sunday, December 22, 2013
Moni Does The METRORail North Line Opening
I wasn't here in town when the METRORail starter Red Line rail line opened back in 2004, so I was determined to be part of the action that took place for the grand opening of the 5.3 mile North Line.
In addition to the free concert that was happening at Moody Park along with the snow area for the kids, rides were free all day on METRORail. So my game plan was to catch the bus to the Downtown Transit Center station, then board the train from there.
But one complication for this big civic party was our Saturday weather. We had a fast moving front coming through the area that was due to hit town right around the time that much of the grand opening festivities were planned to happen. It was also projected to because it was moving at 50 mph create high winds, possible severe weather and drop a lot of heavy rain.
So I did spend a few hours watching the Doppler radar sweeps online, Once the heavy rain passed through the area and didn't produce the predicted high winds, I bounced from the house on my missions to travel the new section of the North Line and also ride it from end to end
I got downtown about noon and started my rail riding mission from the Downtown Transit Center stop which is in front of METRO headquarters on the Red Line. When we arrived at the UH Downtown stop that used to be the terminus for it, noted that they had people gathering in the covered plaza area. There was a podium, camera and a microphone set up there for what I later discovered was the ribbon cutting ceremony along with METRO.employees, city and county officials and guests with passes getting off the train and heading to that event.
Then as the train pulled out of the UH Downtown station we were on the new 5.3 mile section of the North Line that dives under I-10, then enters an elevated platform to take it over railroad tracks toward the elevated Burnet Transit Center /Casa de Amigos Station. There are plans to build an intermodal train and bus station at that location that on hold for now, but what I did notice was there was another wrapped train there parked on one of the side tracks on that platform.
I eventually passed by Moody Park, where the free concert featuring Selena's brother (yeah, that Selena) AB Quintanilla and his band were the headline performers was cranking up and the crowd was gathering for all the fun and festivities there. .
I started to get off and walk around it for a few moments but I decided to stay on the train because I was having nice chat at the time with a retired METRO employee who worked in the training department and the last few years he worked for METRO was as part of its rail operations.
We eventually ended up at its new terminus of the Northline TC/HCC Station. Going to be interesting to see in the near future where and how they take this line up to IAH and I pondered that as I waited for the train operator to switch ends of the train and reverse direction for the trip from the north side of town to past Reliant Stadium and the southern terminus of the line at the Fannin South station.
At this point a Latino family joined me who was doing the same thing I was. We had interesting conversations during that 35 minute ride from there to Fannin South. They noted along with their kids the line passed through downtown, the Museum District, Hermann Park/Houston Zoo, the Texas Medical Center and past Reliant Stadium and how much driving time, parking hassles and gas money it would save them to just take the train to those places.
As we made it to Fannin South that trailing rainband I'd noted earlier in the morning finally made it to where I was located and a sudden blinding rainstorm dropped visibility to the point I couldn't even see Reliant Stadium. By the time I started moving back north up the Red Line and hit the TMC Transit Center station it had cleared out as fast as it had moved in and ensured that when I got off the train I wouldn't need my umbrella.
I said goodbye to my traveling companions when I arrived at my Downtown Transit Center stop. The new year for us in Houston will see even more expansion of our light rail from just one long 12.8 mile long line to a true system with multiple lines (the Green and Purple) in just a few months.
And one of them, the Purple Line terminates just five blocks from my house. Can't wait until it opens.
In addition to the free concert that was happening at Moody Park along with the snow area for the kids, rides were free all day on METRORail. So my game plan was to catch the bus to the Downtown Transit Center station, then board the train from there.
But one complication for this big civic party was our Saturday weather. We had a fast moving front coming through the area that was due to hit town right around the time that much of the grand opening festivities were planned to happen. It was also projected to because it was moving at 50 mph create high winds, possible severe weather and drop a lot of heavy rain.So I did spend a few hours watching the Doppler radar sweeps online, Once the heavy rain passed through the area and didn't produce the predicted high winds, I bounced from the house on my missions to travel the new section of the North Line and also ride it from end to end
I got downtown about noon and started my rail riding mission from the Downtown Transit Center stop which is in front of METRO headquarters on the Red Line. When we arrived at the UH Downtown stop that used to be the terminus for it, noted that they had people gathering in the covered plaza area. There was a podium, camera and a microphone set up there for what I later discovered was the ribbon cutting ceremony along with METRO.employees, city and county officials and guests with passes getting off the train and heading to that event.
Then as the train pulled out of the UH Downtown station we were on the new 5.3 mile section of the North Line that dives under I-10, then enters an elevated platform to take it over railroad tracks toward the elevated Burnet Transit Center /Casa de Amigos Station. There are plans to build an intermodal train and bus station at that location that on hold for now, but what I did notice was there was another wrapped train there parked on one of the side tracks on that platform. I eventually passed by Moody Park, where the free concert featuring Selena's brother (yeah, that Selena) AB Quintanilla and his band were the headline performers was cranking up and the crowd was gathering for all the fun and festivities there. .
I started to get off and walk around it for a few moments but I decided to stay on the train because I was having nice chat at the time with a retired METRO employee who worked in the training department and the last few years he worked for METRO was as part of its rail operations.
We eventually ended up at its new terminus of the Northline TC/HCC Station. Going to be interesting to see in the near future where and how they take this line up to IAH and I pondered that as I waited for the train operator to switch ends of the train and reverse direction for the trip from the north side of town to past Reliant Stadium and the southern terminus of the line at the Fannin South station.
At this point a Latino family joined me who was doing the same thing I was. We had interesting conversations during that 35 minute ride from there to Fannin South. They noted along with their kids the line passed through downtown, the Museum District, Hermann Park/Houston Zoo, the Texas Medical Center and past Reliant Stadium and how much driving time, parking hassles and gas money it would save them to just take the train to those places.
As we made it to Fannin South that trailing rainband I'd noted earlier in the morning finally made it to where I was located and a sudden blinding rainstorm dropped visibility to the point I couldn't even see Reliant Stadium. By the time I started moving back north up the Red Line and hit the TMC Transit Center station it had cleared out as fast as it had moved in and ensured that when I got off the train I wouldn't need my umbrella.I said goodbye to my traveling companions when I arrived at my Downtown Transit Center stop. The new year for us in Houston will see even more expansion of our light rail from just one long 12.8 mile long line to a true system with multiple lines (the Green and Purple) in just a few months.
And one of them, the Purple Line terminates just five blocks from my house. Can't wait until it opens.
Labels:
Houston,
METRO,
METRORail,
Texas,
transportation
Wednesday, December 11, 2013
METRO's Early Christmas Present To H-Town Opening December 21
In making sure everything is working properly like the signals and the boarding platform security cameras as one young tagger found out to his dismay recently, the trains have been simulating passenger runs, stopping, opening and closing doors at the various stations between UH Downtown and the soon to be new termination point of the Red Line at the Northline Transit Center/HCC Station.
To remind everyone in H-town that revenue service is starting on the new light rail line soon, a train was wrapped in a holiday motif to remind everyone that the opening date for revenue passenger service on the North/Red
line will be December 21. There are plans to have a dedication ceremony and concert in Moody Park from 11-5 PM on that date with area vendors and food trucks. Best of all, rides on METRORail are free that day.
Hmm, probably need to take advantage of it on that date so I can get a feel for where the stations are in relation to each other, get the general lay of the land and what's in the area at each one.
And as a rail transit lover, just want to ride it from one end of the line to the other just so I can say I did it.
And as a rail transit lover, just want to ride it from one end of the line to the other just so I can say I did it.
Thursday, October 17, 2013
Smile, You're On METRORail Crimefighting Camera!
The METRORail Red Line extension to the Northline Mall Transit Center from UH Downtown was completed ahead of schedule. It has undergone its unpowered and powered train clearance tests and is awaiting the start of revenue service in early December It'll be the second quarter of next year before METRO completes the construction of the Purple Line near me and get the testing out of the way before I can start riding the METRORail train from the house to wherever I need to go.
One of the other things installed along with the landscaping and artwork at all the METRORail Red Line rail station platforms were the security cameras.
18 year old Salvador Sanchez decided he'd head to the Northline Transit Center/HCC station platform at the end of the extended line and add his own creative spray canned spin to the artwork already installed and on display there.
He probably presumed the installed security cameras weren't operational, but unfortunately for him the security cameras were powered up and got a nice clear screen shot of him doing his tagging business on the station. The METRO Police armed with that photo arrested young Mr. Sanchez on charges connected to tagging the Northline TC/HCC station platform.
So smile, you're on METRORail Crimefighting Camera.
And METRO, any chance that once you're done installing those cameras on the Green and Purple light rail lines you can start installing them at the bus transit centers and Park and Ride lots, too?
Labels:
Houston,
mass transit,
METRO,
METRORail,
Texas
Wednesday, October 02, 2013
METRORail One Step Closer To Red Line Extension Opening
Another series of unpowered train clearance test runs were conducted August 26-29 in addition to electrical power line testing and checking the overhead catenary power wires on both sets of tracks be fore the powered rail car testing took place last month.
The station art is being installed on the eight new stations on the North Line extension along with the landscaping along that route.
While that was going on, the badly needed 19 additional Siemens rail cars METRO purchased from Utah arrived in December 2012 and have been added to beefed up regular service with the original 18 Siemens cars on the Main Street Line. METRO also took bids in February 2011 on an additional 39 cars with options to buy more. Since light rail service started in January 2004, METRORail to the disgust of the knuckle dragging mass transit naysayers has passed the 100 million boardings mark four years earlier than projections.
Since METRO apparently has had no issues with either the unpowered or powered train test runs and electrical testing, it seems that all systems are go for a December revenue service launch on the North Line extension. The Green and Purple Lines construction, especially around the University of Houston has ramped up along with construction of the stations along it.
I noted yesterday when I took the train from the Downtown Transit Center station to the Wheeler Station the new Red Line signs had been installed showing the North Line extension, its eight stations, and the soon to be constructed Central Station where the Downtown Purple and Green Lines cross the Red Line on Capitol and Rusk Streets between the Main Street Square and Preston Stations and will act as the transfer point between the rail lines .
Central Station's design will be selected from a competition in which 70 internationally renowned architectural firms were pared down to five finalists who hoped after their presentations their futuristic designs would become the signature station of the METRORail system. .
Still haven't found out as of yet which of the five designs won the competition, but this is the one I like from SHoP Architects of New York. Then again, I'm not on the board making the final decision for it either.
Can't wait for all the new lines to open. With the North Line being the first of the three, it'll give me an excuse to go check out Northline Mall. .
Labels:
Houston,
light rail,
mass transit,
METRORail,
Texas
Wednesday, May 29, 2013
METRORail North Line Test Train Run Begins
Getting another step closer to service starting on the METRORail Red Line North extension later this year.
Construction on this 5.3 mile extension to the existing Red Line line is ahead of schedule, more than 80% complete.and the stations are well underway despite the local congressional conservafools attempts to frack with its funding.
Since the line isn't powered up yet, METRORail towed a test car at 3-5 mph along the track from the Northline Transit Center station to the UH Downtown one escorted by METRO police. They were to test train clearance, making sure there are no bends or bumps on the tracks and if they ran into that situation, the train was stopped so the location of the problem could be recorded and photographed.
Crews were on board the train monitoring its progress to ensure the operational train functions (tracks, poles, underground andoverhead wiring) are in order before electrical testing and operational train speed tests begin this summer.
If it passes all those tests, H-town will get an early Christmas present and see the North Line open for service in December. Now if they could get cracking on the Southeast and East End lines and expeditiously finish those up, I'll be a happy transit camper.
Construction on this 5.3 mile extension to the existing Red Line line is ahead of schedule, more than 80% complete.and the stations are well underway despite the local congressional conservafools attempts to frack with its funding.
Crews were on board the train monitoring its progress to ensure the operational train functions (tracks, poles, underground and
If it passes all those tests, H-town will get an early Christmas present and see the North Line open for service in December. Now if they could get cracking on the Southeast and East End lines and expeditiously finish those up, I'll be a happy transit camper.
Labels:
Houston,
light rail,
mass transit,
METRORail,
Texas
Subscribe to:
Posts (Atom)












